Sorry - long time no post. Been busy at work and trying to stay warm and get the bathroom finished. Finally got the godforsaken floor done (well, the subfloor, anyways). We ordered the fixtures last Friday, they should be here this weekend. Then we can decide on final placements, get the plumbing done, and proceed to the finish work part of the program.
The Faithful Reader will recall I posted a while back about my need for a mixer. Apparently my blog is wired into the global wish-fulfillment matrix, since not a week after that entry I scored a beautiful vintage Tascam 12×4x2 board off of Ebay for way, way less than a new surface-mount wonder. I ordered a few replacement knobs and a manual from Teac/Tascam, and have pretty much figured out how to integrate it into my studio. I gotta order a crapload of cables, but that’s to be expected in this business.
Been writing a bit, got three new songs in the oven - products of my recent “hey, I grew up in a creepy holler, I should be writing creepy holler music” epiphany. Demos soon - I promise.
TTFN
31 Jan 08
1:39 pm
Dude, you need to post some pictures. Studio, remodeling. all that fun stuff.
22 Apr 08
2:14 am
I agree with Tony. And dude, can we have an update please?
(You’re site’s no longer blocked; I wonder how long that will last.)